Index of /subroom/vachapel/Turner Policy & Procedures
Parent Directory
Cover and Contents of Manual.pdf
Pt 01 Contract Drawings and Specifications.pdf
Pt 02 Preliminary Construction Schedule.pdf
Pt 03 Additional General Requirements.pdf
Pt 04 Progress Payment Applications.pdf
Pt 05 Insurance Requirements.pdf
Pt 06 Subcontractor Safety Program Requirements.pdf
Pt 07 FC Background Drug Testing.pdf
Pt 08 Site Logistics.pdf
Pt 09 Moisture Control Plan.pdf
Pt 10 Owner Contract (RFP).pdf
Pt 11 Federal Acquisition Regulation Clauses (FAR).pdf
Apache/2.2.15 (Unix) mod_ssl/2.2.15 OpenSSL/0.9.8e-fips-rhel5 mod_auth_passthrough/2.1 mod_bwlimited/1.4 FrontPage/5.0.2.2635 PHP/5.2.13 Server at www.collage-usa.com Port 80